• Lead Time 15-30 Days Sf6 Rmu
  • Lead Time 15-30 Days Sf6 Rmu
  • Lead Time 15-30 Days Sf6 Rmu
  • Lead Time 15-30 Days Sf6 Rmu
  • Lead Time 15-30 Days Sf6 Rmu
  • Lead Time 15-30 Days Sf6 Rmu

Lead Time 15-30 Days Sf6 Rmu

Type: Distribution Metering Box
Structure: Protection
Certification: ISO9001:2000, CCC
Form: Partly-welded Type
Operation Voltage: High Voltage
Size: 1 Uint
Samples:
US$ 800/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Diamond Member Since 2021

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Model NO.
AH-SRM-12/
Application Range
Power Plants
Shell Material
Stainless Steel
Shell Protection Grade
IP67
Brand
Anhao
Lead Tme
15-30days
Transport Package
Plywood Cases
Specification
160kg
Trademark
AH-SRM-12
Origin
Guangdong, China
Production Capacity
20000 Units/Per Years

Product Description


24kv SF6 V-Gis High Voltage Ring Main Unit Switchgear


Main Application: The SF6 gas insulated switchgear (GIS) is used for receiving and distributing electric energy in power systems. It is widely used in various applications including:



  • Small secondary distribution stations

  • Switching stations

  • Urban residential areas

  • Airports

  • Railways and tunnels


Company Name: Guangdong Anhao Electrical Equipment Co., Ltd


Product Features




Product Description:


Introducing the switchgear from Guangdong Anhao Electrical Equipment Co., Ltd, designed with cutting-edge features to ensure safety and efficiency:




  • The switchgear is equipped with a "Five Prevention" interlock device, eliminating personnel injury and equipment failure due to human error.

  • Utilizes SF6 gas as an arc extinguishing and insulating medium for optimal performance.

  • Fully sealed and insulated with an IP67 protection level for enhanced safety.

  • Features a reliable safe pressure relief channel to ensure personnel safety in extreme situations.

  • Unaffected by external environmental factors for consistent operation.

  • Compact cabinet size, space-saving, and easy to install.

  • Customizable with electric, remote control, and detection devices to meet various user needs.



Upgrade to our advanced switchgear for a reliable and efficient electrical solution.




Technical Parameters

12kv Technical  Parameter Unit C module F module V module CB module
Load
break
switch
Switch
fuse
Vacuum
circuit
breaker
Isolate/
earthing switch
Vacuum
circuit
breaker
Isolate/
earthing
switch
Rated Voltage KV 12 12 12 12 12 12
Rated Frequency HZ 50 50 50 50 50 50
Power Frequence Withstand Voltage KV 42 42 42 42 42 42
Impulse Withstand Voltage KV 75/85 75/85 75/85 75/85 75/85 75/85
Rated Current A 630 1250 630 630    
Closed Loop A 630          
Off Load Cable Charging A 10          
Rated Active Load Drop-oput Current A 630 630        
When Earth Fault Frop out Current of Cable Charging A 17.4          
Short Circuit Drop-out Current KA   31.5 25      
Making Capacity KA 50 note 63 63 63 63
Rated Short Time Withstand Current KA/3S 20   20 20 25 25
Transfer Current A   1700        
Loop Resistance μΩ ≤300 ≤600        
Mechanical Life Times 5000 5000 10000 3000 10000 3000
24kv Technical  Parameter Unit C module F module V module CB module
Load
break
switch
Switch
fuse
Vacuum
circuit
breaker
Isolate/
earthing switch
Vacuum
circuit
breaker
Isolate/
earthing switch
Rated Voltage KV 24 24 24 24 24 24
Rated Frequency HZ 50 50 50 50 50 50
Power Frequence Withstand Voltage KV 65 65 65 65 65 65
Impulse Withstand Voltage KV 125 125 125 125 125 125
Rated Current A 630 125 630      
Closed Loop A 630          
Off Load Cable Charging A 10          
Rated Active Load Drop-oput Current A 31.5 630        
When Earth Fault Frop out Current of Cable Charging A 43.3          
Short Circuit Drop-out Current KA     20 20 25  
Making Capacity KA 50   50 50 63 63
Rated Short Time Withstand Current KA/3S 20   16 16 20 20
Transfer Current A   1400        
Loop Resistance μΩ ≤300 ≤600        
Mechanical Life Times 5000 5000 10000 10000 10000 5000

Discover our SF6 RMU with a lead time of 15-30 days. Perfect for gas-insulated switchgear needs, this unit is ideal for power distribution systems.

Lead Time 15-30 Days Sf6 RmuLead Time 15-30 Days Sf6 Rmu

Product Description



Welcome to Guangdong Anhao Electrical Equipment Co., Ltd



Product Specifications:



  • Altitude: ≤2000m

  • Ambient temperature: -35ºC to +40ºC

  • Relative humidity:

    • Daily average: ≤95%

    • Monthly average: ≤90%



  • Seismic capacity: 8 degrees



Benefits of Our Product:


Our product is designed to withstand various environmental conditions, making it suitable for a wide range of applications. With a seismic capacity of 8 degrees, you can trust that our product is built to last.




Product Photo

Lead Time 15-30 Days Sf6 RmuLead Time 15-30 Days Sf6 RmuLead Time 15-30 Days Sf6 RmuLead Time 15-30 Days Sf6 Rmu

Company Profile



Guangdong Anhao Electrical Equipment Co., Ltd specializes in manufacturing SF6 RMU with a lead time of 15-30 days. Our products include gas insulated switchgear, ring main unit cabinets, and prefabricated substation boxes.

Lead Time 15-30 Days Sf6 Rmu
Guangdong Anhao Electrical Equipment Co.,ltd offers the SF6 RMU with a lead time of 15-30 days. Ideal for power distribution systems, this gas-insulated switchgear ensures reliable electrical supply.
Lead Time 15-30 Days Sf6 Rmu

Discover our SF6 RMU with a lead time of 15-30 days. Perfect for gas-insulated switchgear, ring main unit cabinets, and more.

Lead Time 15-30 Days Sf6 RmuLead Time 15-30 Days Sf6 RmuLead Time 15-30 Days Sf6 Rmu

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2021

Suppliers with verified business licenses

Manufacturer/Factory
Number of Employees
85
Year of Establishment
2014-04-01